Project location
San Antonio Valley Road approx. 5.8 mi east of Lick Observatory (approx. 0.1 mi east of MM 6)
View the location mapView the proximity map
Project description
A slipout resulted in the loss of the westbound lane. An uphill landslide has also pushed under a portion of the eastbound lane. The permanent repair will involve a retaining structure to address the slipout and the restoration of the roadway. The uphill landslide mass will be cut back to maintain two lanes of travel.
Project timeline
- Damage identified: Early March 2023
- FEMA inspection: Early September 2023
- Construction begin: Anticipated early Spring 2024
- Construction complete: Anticipated Spring 2024
Current status
Final design
Project documents (reports, plans, etc.)
Pending