In 2003 and 2008, the Roads and Airports Department assessed the countywide expressway network for deficiencies and future capital improvement needs. In 2016, planned expressway improvements were re-prioritized for inclusion in the Measure B Expressway Improvement Program. This program dedicates $750 million from local sales tax receipts over a thirty-year period to address bottlenecks, improve traffic flow, and enhance pedestrian/bicycle capacity in the expressway network. These Measure B expressway improvements will be programmed and prioritized for delivery through development of the capital improvement plan.
August 29, 2016 PAB Unapproved Meeting Minutes
May 20, 2019 meeting and implementation plan
Measure B expressway improvements - More information about Measure B
Project | Description |
---|---|
Almaden Expressway at SR 85 - Interim improvements | Interim improvement: add left-turn lane from southbound Almaden to SR 85 |
Almaden Expressway at Branham Lane intersection improvement | Intersection improvement: Extend 4th southbound lane to begin north of intersection |
Almaden Expressway at Camden Avenue intersection improvements | Intersection improvements: add 2nd left turn lanes from Almaden onto Camden, provide for three lanes thru intersection and close sidewalk gap |
Capitol Expressway widening and interchange modifications between I-680 and Capitol Avenue | Widen 6-8 lanes: includes ramp realignments, sound wall improvements, and sidewalk gap closures |
Central Expressway at Thompson intersection improvement | Remove uncontrolled median opening (either signalize or close median) |
Foothill Expressway auxiliary lanes between El Monte and San Antonio | Widen from 4 to 6 lanes by extending right turn lanes and make intersection improvements at El Monte and San Antonio |
Lawrence Expressway at Homestead Road interim improvements | Interim improvement: add eastbound through lane |
Lawrence Expressway at Homestead Road grade separation | Grade separation at Lawrence and Homestead |
Montague Expressway complete 8-lane widening including HOV lanes and auxiliary lanes between Great Mall and McCarthy/O'Toole | Widen from 6 to 8 lanes (HOV lane in westbound only) including modifications to I-880 interchange and closing sidewalk gaps |
Oregon-Page Mill widening (possible HOV lanes) and Trail between I-280 and Foothill Expressway | Widen from 4 to 6 lanes from I-280 to Foothill with intersection improvements at Junipero Serra Blvd-Foothill intersection, including a bike/pedestrian trail extension from Deer Creek to I-280 and enhanced bicycle connection from easterly Old Page Mill Road access to Junipero Serra Blvd |
Oregon-Page Mill intersection improvements between Porter and Hansen | Intersection improvements: extend/add left tern lane at various intersections and convert Hanover intersection to 8-phase signal operations |
Oregon-Page Mill/El Camino Real intersection improvements | Intersection improvements: extend double left turn from westbound Page Mill to southbound El Camino and modify southwest and southeast corners for improved pedestrian crossings |
San Tomas Expressway widening and trail between Homestead and Stevens Creek | Widen from 6 to 8 lanes, including extending San Tomas Aquino Spur Trail along west side of Expressway from Homestead to Stevens Creek and sidewalks consistent with pedestrian route plan |
Santa Teresa-Hale Corridor Road and trail between Dewitt and Main | Build 2-lane road connection with trail |
Santa Teresa-Hale Corridor widening and trail between Long Meadow and Fitzgerald | Widen to 4 lanes and add trail |
SR 17/San Tomas Expressway interchange modifications and auxiliary lane to Homestead | Interim improvement: northbound SR 17 off-ramp improvements to include signal at White Oaks with interconnect at San Tomas/Camden signal and lane reconfigurations |
I-280/Foothill Expressway interchange modifications and auxiliary lane to Homestead | Add signal at the southbound I-280 off-ramp intersection and intersection improvements at northbound I-280 off-ramp, including pedestrian crossing enhancements, Stevens Creek Trail as feasible, and northbound auxiliary lane on Foothill to Homestead |
I-280/Oregon-Page Mill Road interchange reconfiguration | Modify interchange: Proposed concept is a roundabout west of interchange, P&R lot reconfiguration, signal at northbound I-280 off-ramp, frontage road from Christopher Lane to Old Page Mill, and signal at Old Page Mill; bicycle and pedestrian improvements throughout |
Expressway ITS/Signal System Countywide | Intelligent Transportation System (ITS) Short Term: Replace/upgrade/add fiber optic lines; upgrade equipment for new technologies; system wide pedestrian sensors; enhance/replace bicycle and vehicle detection with new technologies |